To aid in the expansion of the winery, Steel Pencil were commissioned to produce the shop drawings for the new warehouse.
The new warehouse located on the corner of Lorimer Street & Sabre Drive was commissioned by the Mount Langi Ghiran Winery to be used as there distribution centre.
Steel Pencil were commissioned to supply shop drawings for the additions to the existing New World. This primarily contained canopy area near the car-parking.
The new warehouse in the Charles Stuart Industrial Estate house houses shops such as Harvey Normal, Boral Timber, as well as Radio Rentals.
Warehouse structure consisting on 360UB51 columns and rafter.
The new Plenty Valley Shopping mall consisted of 10 interlinking structural buildings. Each size was roughly the size of a football field. It has a distinctive cooling tower located near the entrance.
This project comprised the design and construction of an additional frozen and chilled goods Distribution Centre and Environmental Loadout Area to complement Easy Logistics existing drystore and distribution facilities. The building consists of a structural steel frame on concrete foundations with base and wear slabs, clad with EPS panel walls and roof, with precast concrete fire walls to the boun
Steel Pencil was commissioned to provide structural steel shop drawings for part of the new developments at Toyota's National Customer Centre in Palmerston North planned for 2006. The 41 metre long building houses a combined workshop, office and wash bay. 460UB67 portal frames provide the framing for the eight meter high open plan building with a central Mezzanine over the wash bay. Access is gain
Three 310UB46 frames support the canitevered roof structure providing cover for motorists.
Steel Pencil were commissioned to produce shop drawings for the 2 bay extension to the current workshop. This included matching heights to the crane rail that was running the length of the building.